WAN CHAI, Hong Kong -- This is an update for investors who have reserved or purchased a unit in Broadway House located in Bromley. View more photos of the construction from their website.
Works on Broadway House in Bromley will start on levels 1 to 4 setting out the apartment walls and creating the rooms. Following that the next three months plan will consist of the following:
· The fire retarding will be applied to floors 1-7 on the 7-story block and common areas (forward section of the building).
· Demolishment of the existing exit stairs has begun as well as installation of additional foundations and installing the relevant floor structures.
· Coring of the floors throughout the building and installation of the SVP pipes (drainage).
· Replacement of the window panels and co coordinating the intake and exhaust outlets for the MHVR vents and coring their holes where possible.
· Installing a materials hoist to load out the building at a suitable location.
For more inquiries on Broadway house, get in touch with GIHLondon (http://www.gihlondon.com/contact-us).
View our other London apartments for sale today (http://www.gihlondon.com/london_apartments_for_sale).
Contact
GIHLondon