June 08, 2023 - The Saline Water Conversion Corporation (SWCC) has finished the construction of a water transmission system spanning 450 kilometers in the Makkah Region of Saudi Arabia. This pipeline network extends from Rabigh to Jeddah and Rabigh to Mastorah (RJM). The capacity of the former section is 1.25 million cubic meters per day, while the latter can handle 50,000 cubic meters per day. This significant project includes a reservoir, water-pumping stations, long-distance water pipelines, hydraulic control systems, seamless communication infrastructure, and a central control center.
Aesthetix takes great pride in its involvement with this prestigious initiative, as it will significantly improve water availability in the Makkah region. Aesthetix has played a key role by designing, manufacturing, and supplying the Pipeline Leak Detection System (PLDS) for the project, which will ensure continuous monitoring of water transmission.
By thoroughly analyzing and comprehending the project's intricacies, Aesthetix's engineers successfully executed this sophisticated endeavor with meticulous attention to detail and strict quality control measures. The team managed to complete the assigned tasks within the specified timeframe, ensuring timely delivery.
Contact Information
Sarga
Aesthetix Uae
AESTHETIX FZE E - 05, Light Industrial Unit 6
Dubai Silicon Oasis Dubai, UAE.
Voice: 97143262333